Heavy Duty 3 Section Arm Excavator for Tunnel Construction

Product Details
Customization: Available
After-sales Service: 24 Hours on Line
Warranty: Yes
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
In-stock Capacity
The supplier has In-stock capacity
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
100% Finished Products Inspection
The supplier inspects 100% of finished products.
to see all verified strength labels (15)
  • Heavy Duty 3 Section Arm Excavator for Tunnel Construction
  • Heavy Duty 3 Section Arm Excavator for Tunnel Construction
  • Heavy Duty 3 Section Arm Excavator for Tunnel Construction
  • Heavy Duty 3 Section Arm Excavator for Tunnel Construction
  • Heavy Duty 3 Section Arm Excavator for Tunnel Construction
  • Heavy Duty 3 Section Arm Excavator for Tunnel Construction
Find Similar Products

Basic Info.

Model NO.
UMME-37/600L
Customizable
Yes
Trademark
Unite
Origin
China
Production Capacity
50000pieces/Year

Product Description

Heavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionProduct Parameters
Walking form Track walking Installed power 55KW
Gradeability 14 degrees Machine weight 7850kg
Ground Clearance 300mm Track shoe width 450mm
Walking speed 28m/min Impact energy 900J
Heavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionHeavy Duty 3 Section Arm Excavator for Tunnel ConstructionFAQ:
 
1.How to ensure product quality?
   Firstly, we've successfully obtained international quality system certification. Furthermore, our workshop has conducted field certification, you're welcome to drop by our workshop. Lastly, we wholeheartedly welcome and encourage you to appoint independent third-party inspectors to assess our products prior to their dispatch.


2.How long is the delivery time?
  Generally 20 to 30 days.

3.What training and support are there?
  Ordinary equipment is equipped with operation videos for daily maintenance, and large equipment can be installed in the destination country. All equipment is equipped with detailed instructions.

4.What kind of transportation and packaging?
  According to the different sizes of different models, containers, frame containers, roll-on/roll-off ships or bulk cargo can be selected for transportation. They will be fixed, and if placed on the deck, there will be tarpaulins and anti-fall nets.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier