Down-The-Hole Drilling Rigs Equipped with Air Filters

Product Details
Customization: Available
After-sales Service: 24 Hours on Line
Warranty: Core Component Warranty
Manufacturer/Factory, Trading Company
Diamond Member Since 2023

Suppliers with verified business licenses

Registered Capital
3000000 RMB
Plant Area
501~1000 square meters
  • Down-The-Hole Drilling Rigs Equipped with Air Filters
  • Down-The-Hole Drilling Rigs Equipped with Air Filters
  • Down-The-Hole Drilling Rigs Equipped with Air Filters
  • Down-The-Hole Drilling Rigs Equipped with Air Filters
  • Down-The-Hole Drilling Rigs Equipped with Air Filters
  • Down-The-Hole Drilling Rigs Equipped with Air Filters
Find Similar Products

Basic Info.

Model NO.
DTH drilling rigs
Certification
CE, ISO 9001:2000, ISO 9001:2008
Condition
New
Motor
DC Motor
Drill Hole Diameter
100-150mm
Drill Hole Depth
<100m
Bit Type
Diamond Bit
Drilling Way
Rotary
Climbing Angle
40 Degrees
Power Head
Dual Hydraulic Motors
Ground Clearance
450mm
Track Shoe Width
350mm
Transport Package
Container or Bulk Carrier
Specification
5300*2200*3000mm
Trademark
Unite
Origin
China
Production Capacity
50000pieces/Year

Product Description

Down-The-Hole Drilling Rigs Equipped with Air FiltersDown-The-Hole Drilling Rigs Equipped with Air FiltersDown-The-Hole Drilling Rigs Equipped with Air Filters
Overall Size 5300*2200*3000MM Engine Yuchai engine9lkw(Customizable)
Track shoe Width 350MM Mainstream Pump Triple pump
Ground Clearance 450MM Oil Pump 50/50/32
PowerHead Dualhydraulic motor FuelTank Capacity 80L
Drilling Diameter 100-250MM Working Pressure 0.7-2.1MPA
Drilling Depth 50M Propulsion Method Motor chain
Drill Pipe Specifications 76MM*3000MM ClimbingAngle 40°
SwingSpeed 0-130R/MIN Overall Weight 6T
Down-The-Hole Drilling Rigs Equipped with Air FiltersDown-The-Hole Drilling Rigs Equipped with Air FiltersDown-The-Hole Drilling Rigs Equipped with Air FiltersDown-The-Hole Drilling Rigs Equipped with Air FiltersDown-The-Hole Drilling Rigs Equipped with Air FiltersFAQ

1.How to ensure product quality?
   Firstly, we've successfully obtained international quality system certification. Furthermore, our workshop has conducted field certification, you're welcome to drop by our workshop. Lastly, we wholeheartedly welcome and encourage you to appoint independent third-party inspectors to assess our products prior to their dispatch.


2.How long is the delivery time?
  Generally 20 to 30 days.

3.What training and support are there?
  Ordinary equipment is equipped with operation videos for daily maintenance, and large equipment can be installed in the destination country. All equipment is equipped with detailed instructions.

4.What kind of transportation and packaging?
  According to the different sizes of different models, containers, frame containers, roll-on/roll-off ships or bulk cargo can be selected for transportation. They will be fixed, and if placed on the deck, there will be tarpaulins and anti-fall nets.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier